Read the latest information about the Harvey Canal and Flood Protection

from the US Army Corp of Engineers

 

Governor Blanco signs 3 Executive Orders

Commandeering Property for the East of Harvey Canal Floodwall.

Order - KBB 2007 -19

Order - KBB 2007 -20

Order - KBB 2007 -21

 

 

Woodland West Retention Pond Drawings - Site Plan - Cross Section

 

New Orleans Federal City

 

 

OAKDALE BASEBALL

 

Cub Scout Ranks

Cub Scouts Pack 393

 

Woodland Oaks Civic Association
P.O. Box 2411, Harvey, Louisiana 70059-2411

 

 

Huey P Long Bridge Widening Project Info

D.O.T.D. Bridge Information Page

Image
Rendering of proposed Huey P. Long Bridge Project
 

Harvey Canal Bridge Crossing 2007 Update Report Link

Harvey Canal Bridge Crossing Proposals and Presentation (Pre-Katrina)

Lower Harvey Canal Crossing Draft Environmental Assessment
 

jpeg of report cover, opens document
View the document
(a PDF file, 33 MB)
The Regional Planning Commission, working in concert with Jefferson Parish and LaDOTD, has undertaken the Lower Harvey Canal Crossing Draft Environmental Assessment (EA). The EA studied impacts associated with a crossing of the Harvey Canal at or south of Lapalco Boulevard in Jefferson Parish.

Two crossings were recommended as preferred alternatives in the EA. These are as follows:

A new moveable-span bridge in the Harvey Boulevard / Entergy corridor, and

Expansion of the existing Lapalco Boulevard crossing from 4 to 6 lanes via the construction of a new, parallel moveable bridge just north of the existing bridge structure.